Length (L)
130 mmFixture thickness (tfix,1)
25 mmThread
M8Drill hole diameter (d0)
14 mmHole in fixture (df)
16 mmNominal setting depth (hnom,1)
92 mmEffective setting depth (hef,1)
80 mmDrill hole depth (h1,1)
100 mmInstallation torque max (Nm) (Tinst)
25Minimum base material thickness (hmin,1)
160 mmLoad type | Embedment depth (hnom) | Load direction | Load value | ETA | |
---|---|---|---|---|---|
Cracked concrete, C20/25 | NRec | 92 mm | 5,7 kN | ||
Cracked concrete, C20/25 | VRec | 92 mm | 24,0 kN | ||
Non cracked concrete, C20/25 | NRec | 92 mm | 13,1 kN | ||
Non cracked concrete, C20/25 | VRec | 92 mm | 24,0 kN |